TVA Submits First US BWRX-300 Construction Request

The Tennessee Valley Authority has filed a U. S. Nuclear Regulatory Commission for the Nuclear Regulatory Commission of the United States. U. S. For a license to build a GE Vernova Hitachi Energy BWRX-300 small modular reactor on the Clinch River.

This makes the Tennessee Valley Authority (VAT) the first utility in the United States to submit a structure permit application for BWRX-300 technology, and was described through TVA President and CEO Don Moul as “a vital step” for TVA, as well as for the region and the United States. accelerating the progression of new nuclear technologies, their source chain and their delivery model. “The IVA has made the paints to advance the design and expand the first application for the BWRX-300 technology, creating a trail for other public facilities that decide to build the same technology,” he said, adding that TVA “is interested in paints with an administration to push complex nuclear technologies.

TVA invested in the popular BWRX-300 design through a technical collaboration agreement with the generation of Ontario energy, the nuclear energy of Poland Synthos Green Energy and Ge Vernova Hitachi (GVH, previously Ge Hitachi Nuclear Energy, Geh). It also leads a coalition of the application corporations and the source chain that has implemented a concession of $ 800 billion of the U. S. U. S. U. S. Poat Up of the structure of the structure of the U. and a subsidy of $ 8 million to the charge of license.

Small modular reactors (SMRs) are reactors with a smaller and more modular design than the U. S. advertising nuclear fleet. U. S. Lately Operacional. Al like providing protection improvements, their smaller footprint and modular design means they can be built faster, must be used and have greater compatibility in the landscape due to their compact size, TVA said.

TVA already has a first site permit for SMRs on the Clinch River site, certifying that the site near Oak Ridge, Tennessee, is suitable for the construction of a nuclear strength of the site safety, the environment has an effect and emergency planning. It also ended and presented an environmental report for the allocation to the Nuclear Regulatory Committee, and says that preparing the SMR site can begin in 2026.

“VAT’s investment in the popular BWRX-300 generation design will increase its deployment, helping to meet power development and power security,” said GVH President and CEO Craig Ranson. “This step, in addition to this month’s resolution in the province of Ontario, to build the first SMR in the Western world, demonstrates that this generation is complex and real. “

The BWRX-Tres hundred design is a herbal flow SMR refrigerated by MWE water with passive protection systems that exploit the design and license base of the Bubblant water reactor of ESBWR evolved through Geh. arlier this month, the nuclear project approved by the Canadian province of Ontario to begin the structure of the first 4 BWRX-Cien sets planned in the Darlington nuclear project.

Leave a Comment

Your email address will not be published. Required fields are marked *